7 New Metro Stations will be built in Delhi Metro, Traveling will be Easier.

Delhi Metro : In a major relief for Delhi residents, the railway administration has announced the construction of a new metro corridor, which will be part of Phase 4 of the Delhi Metro. This modern public transport system aims to further enhance connectivity and provide better commuting options for the people of Delhi. The new corridor will feature seven new metro stations and is expected to significantly ease travel in South Delhi.

Overview of the Project

The newly announced Lajpat Nagar–Saket G Block Corridor will connect Lajpat Nagar to Saket G Block, covering a stretch of approximately 7.3 kilometers. The entire construction is expected to be completed within three years.

For the first time, the Rail Vikas Nigam Limited (RVNL) has been assigned responsibility for executing a Delhi Metro project. RVNL has shared detailed information about the corridor, including the proposed station list and construction type. All stations on this route will be elevated platforms, meaning they will be built above ground level on viaducts or similar structures.

Stations on the New Metro Corridor

The metro line will pass through the following seven elevated stations:

  1. Saket G Block
  2. Pushp Vihar
  3. Saket District Centre
  4. Pushp Bhawan
  5. Chirag Delhi
  6. Greater Kailash-1 (GK-1)
  7. Andrews Ganj
  8. Lajpat Nagar

This corridor will operate three-coach metro trains, each capable of carrying around 300 passengers. Compared to other lines, these stations will be smaller and more compact, measuring about 74 meters in length. This design will help reduce both construction time and costs.

Project Cost and Details

The total estimated cost of the corridor is ₹447.42 crore. According to the Managing Director of RVNL, this project aligns with the Delhi Metro Rail Corporation’s (DMRC) vision of creating a world-class urban transport system. He added that this development will be a major contribution to Delhi’s urban infrastructure, offering a significant step toward sustainable city mobility.

The MD also emphasized RVNL’s commitment to completing the project with excellence, safety, and innovation. Although RVNL has been involved in metro projects across various parts of India, this marks the first time it will handle a Delhi Metro project. The team has assured that the construction will be completed within the scheduled timeline.

Key Highlights

  • Corridor Name : Lajpat Nagar – Saket G Block
  • Total Length : 7.3 km
  • Type : Elevated Corridor
  • Stations : 7 Elevated Stations
  • Train Configuration : 3-coach trains (capacity ~300 passengers per coach)
  • Estimated Cost : ₹447.42 crore
  • Completion Timeline : 3 years
  • Executing Agency : Rail Vikas Nigam Limited (RVNL)
  • Part of : Delhi Metro Phase 4

Conclusion

The new Delhi Metro corridor from Lajpat Nagar to Saket G Block represents a major advancement in Delhi’s public transport infrastructure. It promises to improve connectivity, reduce traffic congestion, and enhance commuting convenience for thousands of daily passengers. With RVNL at the helm and DMRC’s vision guiding the project, this corridor is expected to become another landmark in the capital’s expanding metro network, driving Delhi closer to a smarter and more sustainable future.

Leave a Comment